{"id":709,"date":"2023-03-27T09:56:00","date_gmt":"2023-03-27T09:56:00","guid":{"rendered":"https:\/\/lwegatech.net\/uegcl\/?p=709"},"modified":"2025-11-18T09:57:07","modified_gmt":"2025-11-18T09:57:07","slug":"karuma-supplies-40mw-to-the-national-grid","status":"publish","type":"post","link":"https:\/\/lwegatech.net\/uegcl\/karuma-supplies-40mw-to-the-national-grid\/","title":{"rendered":"Karuma Supplies 40MW to The National Grid"},"content":{"rendered":"\n<p>The 600MW Karuma Hydropower Project is nearing completion after having successfully synchronized Unit No. 1 of six to the national grid and added 40 megawatts to the national grid.<\/p>\n\n\n\n<p>On Wednesday 23 rd March 2023 at 16:14 hours, Unit no.1 of 6 at the 600MW Karuma Hydropower Plant was successfully synchronized to the national grid. This milestone marks the start of power generation at the soon-to-be-commissioned plant.<\/p>\n\n\n\n<p>The synchronization was witnessed by teams from UEGCL, Sinohydro Corporation Ltd, AFRY (Owners Engineers), and the Ministry of Energy and Mineral Development.<\/p>\n\n\n\n<p>Karuma HPP is made up of six units, each with an installed capacity of 100MW giving a total of 600MW when all units are operating at full capacity.<\/p>\n\n\n\n<p>Hon. Dr. Ruth Nankabirwa \u2013 Minister of Energy confirmed that after the successful exercise, it is now proof that Karuma HPP can pull power and bring it to the substations without hiccups.<\/p>\n\n\n\n<p>\u201cWE did the test successfully and we saw electricity on the grid, which is historic for us.\u201d Said Enock Kusasira \u2013 Head of Communication and Corporate Affairs, UEGCL.<\/p>\n\n\n\n<p>The commissioning of Karuma HPP will be a unit-by-unit exercise.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 600MW Karuma Hydropower Project is nearing completion after having successfully synchronized Unit No. 1 of six to the national grid and added 40 megawatts to the national grid. On Wednesday 23 rd March 2023 at 16:14 hours, Unit no.1 of 6 at the 600MW Karuma Hydropower Plant was successfully synchronized to the national grid. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":710,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17],"tags":[],"class_list":["post-709","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/posts\/709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/comments?post=709"}],"version-history":[{"count":1,"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/posts\/709\/revisions"}],"predecessor-version":[{"id":711,"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/posts\/709\/revisions\/711"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/media\/710"}],"wp:attachment":[{"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/media?parent=709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/categories?post=709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lwegatech.net\/uegcl\/wp-json\/wp\/v2\/tags?post=709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}